West Side
South Side
East Side
Ground face block on the north wall.
Block on the back side of the Ambulance bays.
Nailing boards for cabinets in the VHC Kitchen.
Working on the floor in the VHC Apparatus Bay.
Working on the floor in the VHC Apparatus Bay.
Drywalling has started on the first floor. Hallway in VHC dorm Bunk Rooms.
Drywall on the bottom off the trusses. Second floor looking across the EMS offices.
Conference Room, IT Room and VHC offices.
Work on the Ambulance Bays. Looking east.
2 comments:
what time is the walk thru this week?
Walk thru's are usually on Sunday's from 1-2, unless otherwise stated.