West Side
South Side
East Side
Concrete ramp to the entrance to VHC Apparatus Bays. West side.
Epoxy floors have started in the VHC Apparatus Bay.
Entrance to the VHC members parking lot. West side of SESB.
Manhole lids for the 10,000 gallon rainwater collection tank.
Water will be used for washing vehicles.
man door on the left is to VHC Living area, on the right is to Under Ambo Storage.
46 Gear Grid lockers in VHC Gear Room.
IT Room.
VHC second floor office corridor.
Doors on right are Deputy/Assistant Chief's Office and
Captain/ Lieutenants Office. VHC Support Office at end of corridor.
(Ladies Auxiliary, Fire Police and Fire Safety Task Force)
43 EMS Lockers in Locker Room.
EMS Kitchen and Pantry.
EMS Apparatus Bay. Door on left wall to Gear Room
left to right door to EMS Living area, Decon Room and Storage.
Elevator on Second Floor.