8/30/2011 The Blocks Walls are Going Up

Construction is moving right along. The footers are at 85% and the walls are really taking shape.



Storm water ponds are turning green.


This is the VHC apparatus bay corner closest to Walnut Bottom Road and town.


Again, closest corner to Walnut Bottom Road and town. The interior footers you see are the VHC Storage Room, Gear Washing Room and Engineers Room on the north side of the Bay area.


Looking across from the back of the storage room under the Ambulance Bays. The blocks/footer on the left is the stairwell from the Fitness Room on the first floor to the Study on the second.


Storage area under the Ambulance bays.


Looking south along the east walls.


Taken from the Orange Street/Town corner of the Ambulance Bays, The Storage area is on the right side and the area on the left side, inside the 'U' wall is for the HVAC tower and Generator.


Looking east along the first floor Storage Area and the center of the Ambulance Bays.


Looking out towards Walnut Bottom Road at the entrance to the rear parking area.