Sunday, April 15, 2012

4/15/2012 EMS Kitchen, 2nd Floor Carpet and the Fence is Down

 West Side

 South Side

East Side


 Carpet in the VHC President's Office.

 Sidewalks in on the east side.

 Carpet in the EMS Bunk Rooms.

 Cabinets in the EMS Kitchen.

 Shower in the EMS Decon Room.

 More work to do in the IT Room.

 3-Bay sink in the VHC Gear Wash Room for SCBA maintenance.

 Mop sink in the VHC Gear Wash Room.

 Organizer in the VHC Watch Room.

 Sport floor installed in the Fitness Room.

 Under Ambo Storage Room.

 Curbs and sidewalk in the east parking area.

 Sidewalks and topsoil on the east side.

Flag poles in the east parking lot.

Sorry for the picture quality his week. I'm on the disabled list and had to send Sam through with the point and shoot.