2/4/2012 FD Bay Doors, EMS Bays Ready for Concrete

 West Side.

 South Side.

East Side.

 VHC Kitchen from the TV Room.

 VHC Apparatus bays doors being installed.

 In floor heating in EMS Ambulance bays.
Area without in floor heating is the Study and EMS Storage.

 Roof over the VHC Back doors.
Left man-door to VHC Apparatus Bay, right door to Stairway from Fitness Room to Study.
Second floor window is EMS Kitchen.

 EMS Kitchen and Pantry.

 Stairs for in the Hose Tower. Hose hanging rack is installed in the tower.
Doors (L-R) VHC Storage Room (Air Cascade & Ice Machine) VHC Gear Wash Room (Gear Washers and dryers and SCBA Cleaning Station) Engineers Room and Hose Tower.

 Stairs from the 2nd floor VHC Offices to the Apparatus bays.
Bottom doors are both into the Gear Room.
Upper window is the Captain/Lieutenants Office.

Main entrance to the first floor. 1st floor window is VHC Watch Room.
2nd floor windows (L-R) VHC Presidents Office. VHC Support Office (Fire Police, Ladies Auxiliary and Fire Safety) VHC corridor and VH C Fire Chief.