Saturday, March 10, 2012

3/10/2012 Epoxy Floors, Lockers & Elevator Work

 West Side.

 South Side.

East Side.

 Lockers for in VHC Pantry sitting in VHC Kitchen.

 VHC Gear Room.

 Stalls in VHC Locker/ Shower Room.

 Elevator installation has finally begun.

 VHC Lockers, sitting in the Multipurpose Room.

 EMS Locker Room.

 EMS Shower Room.

 EMS Lockers, sitting in the back Ambulance Bay.

 Ambulance Bay. EMS Gear Room on the right.

 EMS TV Room.

 West side of Ambulance bays. Generator and HVAC Cooling Tower.

 First floor entrance from East Parking lot.

 Hose Tower.

 Looking south along the west side of the VHC Apparatus bays.
Prepping for pavement.

Controls for the in floor heating. VHC Apparatus Bay.

No comments: