Saturday, March 3, 2012

3/3/2012 Epoxy Floors, VHC Exhaust & EMS Paint

 West Side.

 South Side.

East Side.

 Fire Hydrant on west side of building.

 Rainwater collection at VHC back entrance.

 Exterior lighting down the old driveway. 
The new driveway off Orange Street will be wider and east of the old drive.

 Hallway from Under Ambo Storage to Fitness Room (right) and Back Stairs (left).

 VHC Pantry from VHC Kitchen.

 VHC Men's Locker Room.

 Water supply in Mechanical Room.

Water Heaters in Mechanical Room. 

 Panel boxes in Mechanical Room.,

First floor corridor. EMS Storage and VHC Museum left, Multipurpose Room right.
Looking north.

 VHC Watch Room.

 VHC Watch Room.

 VHC Apparatus Bay with Vehicle Exhaust system being installed.

 VHC second floor offices. Looking from exit to Apparatus Bay (to my left)
towards Walnut Bottom Road, Orange Street intersection.

 IT Room.

 Elevator Mechanical Room.

 Front Stairway, near Orange Street second floor entrance.

 EMS Office corridor, looking towards Ambulance Bays.

 EMS Office along Orange Street side.

 EMS Junior Member Area.

 EMS Kitchen and Pantry.

 EMS Ambulance Bay doors.

 EMS Gear Room in Ambulance Bay.

EMS doors (L-R)Living area - Decon - Storage from Ambulance Bay.

 Second floor Elevator shaft.

 VHC Gear Room. Apparatus Bays left.

Building wall at Generator and HVAC tower.

No comments: