Sunday, October 9, 2011

10/9/2011 More Walls, Concrete Planks and a Concrete Floor

In addition to these pictures I have added the Artist Renderings to the bottom of the page, including a view of the west side.

 Panorama of the west side (town side)

 Orange Street side. Concrete planks have been set over the Under Ambo Storage area. On top this will be three EMS bays, EMS Gear Room and the Study.

North side rooms. Open Storage, Storage, Gear Wash Room, Engineers Room and Hose Tower.

 Walnut Bottom Road East, Exit only. Note how close the pole is.

 Walnut Bottom Road West entrance/exit.

 Walnut Bottom Road west entrance/exit.

 Walnut Bottom road west entrance/exit. Some of the concrete drive is poured.

 West side of VHC Apparatus bays. The doors are starting to go up.

 Under Ambo Storage.

 South side of VHC Apparatus Bay. This is the wall to the Gear Room.

 MultiPurpose Room.

 VHC Gear Room. Through those doors is the Apparatus bay.

 VHC Living area and bunk area. Shower/Locker Rooms along back wall (left).

 Elevator shaft. Stairwell behind it (right).

 Mechanical Room.

 Far left is the hallway to Apparatus Bay, next is a restroom and right is the VHC Laundry room. Taken from hallway, Kitchen/TV Room is behind me.

 Another view of the VHC Gear Room looking towards the Apparatus Bay. Towards where I'm standing and across the hall from the Gear Room doors will be the doorways to the Bunk Rooms.

 Under Ambo Storage area. Fitness Room is to the left. There is a concrete plank ceiling and a concrete floor now.

 Under Ambo Storage area, this is the Electrical Room.

 Under Ambo Storage area, again. Fitness room is at the far end toward VHC living area.

 West side looking northeast. Shows VHC Apparatus doors.

 Outside west corner of Under Ambo Storage. Generator will sit right here.

 Walnut Bottom Road east exit only. Note pole on left side.

 Training hatch from Mezzanine to VHC north side Storage Room. When open this hatch can be used for rope rescue training.

Open Storage at north side of VHC Apparatus Bay. Concrete planks have been set on the Mezzanine. There will be a Storage Room built on this side of the Mezzanine.