Tuesday, October 25, 2011

10/25/2011 Getting Ready for the Second Floor

Second floor decking is down and waiting for concrete.

 Northwest corner of VHC Apparatus Bay.

 Northeast corner of VHC Apparatus Bay.

 East side of VHC Apparatus bay.

 First floor looking southwest, Vestibule is on the right.

 Outside of Multipurpose Room, ready for backfill.

Orange Street side. backfill has begun. 

 More backfilling on the Orange Street side.

 West side of VHC Apparatus Bays, looking northeast.

 VHC Gear Room on the left, Watch Room center and Vestibule right.

 Stairway in southeast corner, Elevator is in the center of the picture.

 Southeast Stairway right, Elevator center, Storage behind elevator and Multipurpose Room left.