Wednesday, November 2, 2011

11/2/2011 Roof Trusses and the Second Floor


 VHC Apparatus Bay from 2nd floor doorway.

The 2nd floor is poured and some of the outside walls are up.

 The south wall of the VHC Apparatus bay is up.

 The north wall of the Multipurpose Room, the 1st floor Vestibule and the VHC Watch Room are closed in.

 VHC Watch Room.

 Door to VHC Apparatus Bay, door to restroom, door to laundry and door to Gear Room from VHC TV Room.

 Not much new in the Under Ambo Storage area.

 Looking out over the VHC Living area from the VHC Kitchen.

 Outside the Under Ambo Storage area.

 East face of VHC Apparatus Bay, looking north.

 east side of the Multipurpose Room.

 Second floor was poured last Friday, Backfilling continues and the outside walls are starting to go up.

 Outside walls on the Orange Street side. These are EMS office windows.

 The footer for the Ambo Bays was poured today.

 Doorway from Study to stairway to the Fitness Room.

 Looking across EMS living area to doorway and window from VHC Offices to VHC Apparatus bay.

 Construction site.

 Second floor. Conference room on my left, Elevator shaft and stairway center.

 East Side of VHC Apparatus Bays from 2nd floor.

Elevator Shaft. 

 Generator retaining wall.

Generator retaining wall.