12/4/2011 The Roof is Getting Closer to Being Done

 West Side

South Side 

East Side

 10,000 gallon rainwater collection tank for washing apparatus and pump testing and training. This will be installed underground outside the entrance to the Under Ambo Storage area.

West side of VHC Apparatus Bay. 

 South side of the VHC Apparatus Bay.

 Stairway between the Fitness room on the first floor and the Study on the second floor.

 East side of the VHC Apparatus Bay.

 North side rooms in the VHC Apparatus bay.

 Main hallway in the VHC living area. Laundry and Gear room on the left and Bunkrooms on the right.

 Work continues on the Hose Towet at the northeast corner of the VHC Apparatus bay.

 First floor entrance on the east side. Window now cut into VHC Watch Room.

Second floor looking west. EMS Offices will be here. 

Second floor looking west across EMS Bunkroom / Locker Rooms.