Saturday, December 24, 2011

12/24/2011 Bricks, Shingles and Windows

East Side 

South Side 

West Side

 Brick start to go up the stairway between the Fitness Room and Study.

 The lid to the Hose Tower. 

 Shingling has begun.

Second floor rooms are lined off.

 Second floor windows are in. This is the EMS offices.

 10,000 gallon rainwater collection tank is finally in the ground.

 Split face block is near complete on the west side of the Ambulance bay 
and the HVAC tower is in place.

 VHC Mezzanine, training wall, manhole and Secure Storage Room.

 Split face on the west side of the Ambulance Bays.

 The mud in the VHC  Apparatus Room is gone and stone is down..

The wall for the bar in the VHC Kitchen is started.