Sunday, January 15, 2012

1/15/2012 , Bay Floors 2nd Floor Ceiling and Finish Block

West Side

 South Side

East Side

Ground face block on the north wall. 

 Block on the back side of the Ambulance bays.

 Nailing boards for cabinets in the VHC Kitchen.

 Working on the floor in the VHC Apparatus Bay.

 Working on the floor in the VHC Apparatus Bay.

Drywalling has started on the first floor.  Hallway in VHC dorm Bunk Rooms.

 Drywall on the bottom off the trusses. Second floor looking across the EMS offices.

 Conference Room, IT Room and VHC offices.

Work on the Ambulance Bays. Looking east.

2 comments:

E4 Lt said...

what time is the walk thru this week?

Haney said...

Walk thru's are usually on Sunday's from 1-2, unless otherwise stated.