Tuesday, January 10, 2012

1/8/2012 More Blocks and Drywall Soon

 West Side

 South Side

East Side

 Concrete poured in the northside room in the VHC Apparatus Bay.
This is the Engineers Room.

 Drywall is ready in most of the first floor rooms. 
This is one of the individual VHC Bunk Rooms.

 Concrete in stairs in southeast Stairway.

 Heating ducts on second floor.

 EMS Kitchen and Pantry.

 Drywall soundproofing between VHC Kitchen/TV Room and the Bunk Rooms. 
They will build another wall on this side.

 Transformer in the Electrical Room.

 More block on the northwest corner of the VHC Apparatus Bay.

 Brick and block on the back stairway and west face of the VHC Apparatus Bay.

 Lid to the Hose Tower. Yes, they will shingle it on the ground before setting it in place.

VHC Apparatus Bay with drywalled ceiling. Looking south.

1 comment:

E4 Lt said...

wow, all the work u have been doing, and "Ken Nehf" gets the chairman credit... lol, wouldn't be the first time they didn't get the facts right...